If you are preparing for any competitive exams like UPSC IES, GATE, SSC JE, State PSC, etc. or want to check your knowledge about any particular subject of Civil Engineering then solving MCQ's can be the best option. In this way you can also know your weakness about particular section of the subject.
MULTIPLE CHOICE QUESTIONS
Level - Beginner (Ideal for SSC JE, State PSC and other Small Level Exams
126. The slow
setting cement will have higher percentage of
(a) Tri
calcium aluminate
(b) Tri
calcium silicate
(c) Gypsum
(d)
Di-calcium silicate
127. Di-calcium silicate
(a) Hydrates
rapidly
(b) Generates
less heat of hydration
(c) Reacts
with water only
(d) Hardens rapidly
(a) 10-12 hours
(b) 2-5 days
(c) 1-8 days
(d) 14-28 days
129. In quick
setting cement the compound added is called
(a) Aluminium sulphate
(b) Gypsum
(c) Aluminium silicate
(d) Calcium sulphate
130. As per IS 269-1975, the initial setting
time of Portland cement is
(a) 1/3 hour
(b) 1/2 hour
(c) 1 hour
(d) 5 hours
131. Consider
the following statements:
More than 6%
magnesium oxide by weight in cement results in
1. High early strength and high heat
generation.
2. Less tendency towards volume change and
formation of cracks
Which of these statements is/are correct?
(a) I only
(b) 2 only
(c) Neither 1
nor 2
(d) Both 1 and 2
132. Vicat's apparatus is used to determine
the
(a) Initial setting time of cement
(b) Final setting time of cement
(c) Normal
consistency of cement
(d) All of
the above
133. Gypsum is added in cement
(a) After burning
(b) Before
burning
(c) After
grinding
(d) At the time of mixing of raw materials
134. Gypsum is added in cement to
(a) Increase
its initial setting time
(b) Decrease
its initial setting time
(c) Increase
its compressive strength
(d) Increase
its bound strength
135. The most suitable temperature for burning
of cement in rotary kiln is
(a) 300°C to 400°C 36
(b) 900°C to 1100°C
(c) 1500°C to 1650°C
(d) 1800°C to 2000°C
136. The
small lumps of cement evolved after burning are named as
(a) Clinkers
(b) Nodules
(c) Kankar
(d) All of the above are correct
137. Fineness of cement is measured in the
units of
(a)
Volume/mass
(b) Mass/volume
(c) Area/mass
(d) Mass/area
138. The residue on I.S. sieve No. 9 of
ordinary portland cement should not exceed
(a) 5%
(b) 10%
(c) 20%
(d) 30%
139. If ordinary sand is used, then the
compressive strength of ordinary portland cement after 3 days curing should not
be less than
(a) 75 kg/cm2
(b) 115 kg/cm2
(c) 160 kg/cm2
(d) 175 kg/cm2
140. The residue on I.S. sieve No. 9 of rapid
hardening cement should not exceed
(a) 5%
(b) 10%
(c) 20%
(d) 30%
141. In the
foundation of abutments or dams most suitable cement
is
(a) Ordinary
portland cement
(b) Rapid
hardening cement
(c) High
alumina cement
(d) Low heat
portland cement
142. While preparing mortar, the binding
material generally used is cement and
(a) Lime
(b) Cinder
(c) Surkhi
(d) Fly ash
143. While
preparing lime mortar, generally inert material used
is
(a) Stone
powder
(b) Pit sand
(c) River sand
(d) Brick
powder
144. Consider
the following statements:
Sand in
cement mortar is used for
1. Increasing the strength
2. Reducing the shrinkage
3. Decreasing the surface area of the binding
material
4. Decreasing the quantity of cement
Which of
these statements are correct?
(a) 1, 2 and
4
(b) 1, 2 and
3
(c) 1, 3 and
4
(d) 2, 3, and 4
145.
Separation of water from the fresh concrete is called
(a)
Segregation
(b) Bleeding
(c) Hydration
(d) Seepage
146. The
strength of cement concrete depends on
(a) Water cement ratio
(b) Quality of water
(c) Quantity
of aggregate
(d) Quality
of cement
147. Consider the following statements:
1. The
crushing strength of concrete is fully governed by water-cement ratio.
2. Vibration has no effect on strength of
concrete at high water-cement ratios.
3. Workability of concrete is affected by
improper grading of aggregates.
Which of the statements is/are correct?
(a) 1, 2 and 3
(b) 2 and 3 only
(c) 2 only
(d) 3 only
148. The
minimum water cement ratio required for making concrete workable is
(a) 0,4
(b) 0.5
(c) 0.6
(d) 0.8
149. Portland cement is manufactured by
burning in a Kiln the following materials
(a) Limestones and alumina
(b) Limestone and clay
(c) Limestone and sand
(d) Lime and clay
150. Grading of aggregate in a concrete mix is necessary to achieve
(a) Adequate workability
(b) Higher density
(c) Reduction in voids
(d) Better durability
We are putting efforts to add more and more questions or study
materials on our website and soon to come Mobile App, from various sources so
that any student or an engineer need not to look other websites or platforms.
Education is meant to be free and it will always be on our website.
- Civil Engineering Practice - Building Material & Const. - Question Bank - Set-1
- Civil Engineering Practice - Building Material & Const. - Question Bank - Set-2
- Civil Engineering Practice - Building Material & Const. - Question Bank - Set-3
- Civil Engineering Practice - Building Material & Const. - Question Bank - Set-4
- Civil Engineering Practice - Building Material & Const. - Question Bank - Set-5

No comments:
Post a Comment